Increase factory utilization
and productivity
with your existing resources
Customer stories:
+€4M PO SECURED
ROTHENBERGER Group was able to secure an unplanned €4M PO during Q4 due to the increased capacity that followed digitalization
+30% MACHINE AVAILABILITY
Eckart hydraulics increased productivity by 30% within 4 months from installation, across all weekdays, shifts, and production halls.
To read the full case study click here
INCREASE AVAILABILITY BY CLASSIFYING IDLES
Henle Baumaschinentechnik GmbH eliminated idles that are unnecessary and easy to prevent:
Setup time reduced by 41%
Lack of materials reduced by 67%
Lack of staff reduced by 100% down to 0
The result: 10% productivity increase, with no heavy investment